Main stages of repair works in the apartment.
How to start repair works of the apartment?
The very first phase of the repair of old homes is the damage and dismantling first off of the shabby walls and partition walls, removing the wall and ceiling finish. This stage is among the most "filthy" stages of the repair.
One more amongst the most important and "dirty" works is the window block replacement. It is needed to do this first of all since dirt and dust will be unallowable during following stages and it is restricted at all to open windows throughout painting and wallpaper works (big drops of the temperature and wetness are unallowable). After installing windows and windowsills it is needed to pack them instantly in polyethylene movie and to cover windowsills in addition by the fiber board (in order to avoid scratches).
The following stage is electrical wiring. Wiring can be set up in walls or along the floor. Wiring is made inside the pipelines to make sure electrical safety and increase reliability. The pipe safeguards electrical wiring from external damages and permits to replace the wire completely without breaking walls and floor simply by inserting the brand-new wire rather of the old one.
House Painting follows the circuitry. The regular mistake during the simultaneous conducting of such works happens when employees forget to lay out one of the cable televisions and house painters have actually already plastered and smoothed out the wall. As a result, extra works are needed to seal chases on the finished wall. The places of the feed switch and wall outlet place and their number need to be thought-out beforehand. The plan of power wiring is typically included into the design project.
Later on the system must be prepared to service in case of failures. In addition to the circuitries, the telephone cable television and the TV cable are laid out. The power cable television must not be laid out near the telephone and antenna cable televisions to prevent noise pickup and disturbance. The most peculiar minute is setting out the television cable television. In order to make two (or 3) TV sets in the apartment or condo the second cable television is typically just "firmly soldered" in parallel, so the cable resistance is decreased. As an outcome, the display quality is deteriorated, many programs can't be gotten and etc. In order to avoid such scenario it is essential to welcome a professional with unique equipment. He will determine the signal level of the each TV-feeder and set up TV-amplifiers or TV-filters.
Painting is the most long-lasting process, that is why it is carried out all at once in all facilities, if it is possible. Delays are linked with the innovation. Each used layer of the plaster (or filling in ending up) must dry entirely before the work will continue.

Then works in hygienic arrangements are conducted according to the plan. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below stage is assembling ceiling and laying tiles on the flooring. And at last other hygienic devices, mixers and devices are mounted.
After circuitry, setup of rosette plates and terminal boxes the voltage is signed in all point. Ends of circuitry are insulated and set out into rosette plates. Sockets and breakers are not set up during this stage in order to conserve their surface area look. The finish puttying of walls is conducted all at once. The technically exact control of drying of the layer of the plaster (filling) is performed by drymeter. It is a special instrument that determines wetness of the material.
The following phase is the process of fill. Fill can be made with various materials-- from usual masonry cement-sand mix to self-aligning floors. The benefit of the simple mixture is its cheapness, the disadvantage is that such mixture is much more difficult lined up at the level and the last dry time of such fill is 40 days, just then the next stage of the deal with floor can be conducted, i.e. the period is too long. Self-leveling self-aligning floorings are much more costly, however more technological. Aligning occurs almost "instantly" i.e. fluid solution of mix is poured out, then it runs and you get the horizontal surface. The final dry time is 15 days i.e. you have significant time economy. The system "warm flooring" is read this installed into the fill. If the so-called "damp procedures" are inapplicable the technology of the dry aligning (the fill technology) is used bases for floors with adjustable flooring battens are mounted.
After fill door boxes and door are set up. Setup of doors should take into the account thickness of future floor covering. After setup the door can be taken off its hinges and got rid of till completion of repair work or loaded into polyethylene movie to protect from damages. At the same time ceiling can be painted and the tile can be laid in that facilities where it was prepared. The tile must be laid on the absolutely dry overlay.
Finishing of the floor mounting depends on the prepared covering. In most cases (if finish covering is not the tile) fill is covered by bitumen mastic and plywood sheets are laid. They are fixed to the floor by self-tapping screws. One plywood sheet is repaired by 30-50 self-tapping screws to offer the close repairing of plywood and long-lasting service of the floor without squeak and bulging. The plywood offers the extra heat- and acoustic insulation. After installing of the plywood is finished, wallpaper for painting can be pasted on walls.
In premises where finish covering of the flooring is laminated floor covering or parquet stockpile, the regular wallpapers are pasted (not for painting) in the first place. Then the flooring covering is mounted.
If surface covering of the floor is the block parquet, the parquet is laid in the top place, then it is scraped and covered by one layer of lacquer. After this the common wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending on the quality of the parquet and lacquer). The mentioned effect is linked just with such scrambling process when the great amount of dust is developed. In spite of the reality that excellent floor grinders are geared up with the vacuum, the enough amount of dust is sped up on surrounding topics consisting of walls. Dust is really acerbic and is badly cleaned off. That is why in order not tips for first-time homeowners to harm wallpapers, they are pasted after scrambling and in order the parquet do not take in the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be ended up. It is left just to set up the plinths, decorative components, breakers and sockets, curtain holders, to hang doors, plant-bands and others.
In conclusion it is essential to keep in mind that the series of works was listed in general and can change depending on the definite circumstance-- the number of spaces in premise, your resources, peculiarities of the construction of the multilevel premises. It is based on common sense and every person efficient in analysis can individually produce such a series.